Bearing
Built for the 10-person GC, not the Fortune 500

Run five commercial jobs without twelve spreadsheets.

The scheduling rigor of real CPM, the contract accuracy of AIA G702/G703 progress billing, and the daily field proof that defends your claims. Bearing unifies your critical path, monthly draws, and jobsite compliance in one platform — built specifically for commercial contractors who’ve outgrown disconnected spreadsheets.

Transparent pricing at $199/mo for 10 seats · Import your MS Project XML in one step · Full CPM logic works offline

Construction manager using Bearing in the field
Offline-Capable Field Capture

No signal in a basement or steel frame. Bearing logs work offline and syncs when you reach the trailer.

Choose your workflow

Three places a job quietly loses money

The gap between the estimate and what the field actually built. The slip that moves your completion date. The paperwork trail that decides a dispute two years later. Bearing covers all three, in one place, for one price.

The job that quietly ate your margin

Most projects lose their margin in the cracks between the estimate, the schedule, and the actual field performance.

Margin doesn't disappear in one bad day. It leaks between what you bid, what the field actually built, and what you got around to billing. Bearing reconciles field-verified progress against the budget as it comes in, so the cost ledger shows budget, committed, paid and estimate-at-completion in one view — while you can still do something about it.

  • Automated carry-forward and field progress reconciliation eliminate the monthly billing scramble
  • Variance shows up during the job, not in the closeout review
  • Per-draw payment ledger — paid-to-date is always derived, never guessed
  • Cost ledger shows EAC and variance live — budget to committed to paid in one view
Cost ledger — budget, committed, paid and estimate at completion in one view

Know which slip costs you the end date

Knowing you are behind schedule is not the same as knowing which delay costs you the end date.

A Gantt chart shows you the plan. A CPM engine tells you what a slip is going to cost. Bearing runs a full forward and backward pass every time the field reports in, so total and free float are current, the critical path reflects where the job actually is, and you can see which of today's three problems is the one that moves your completion date. Delays get logged against the activity they hit, with the weather and manpower record attached — so the schedule doubles as the evidence trail if the delay becomes a claim.

  • Total and free float on every activity — see which slack is real
  • Schedule advances from field actuals — critical path reflects where you are, not where you planned to be
  • Data-date progress override — out-of-sequence work reschedules correctly instead of quietly lying
  • Weather and delay log tied to the affected activity, ready for a time-impact claim
Gantt chart with the critical path and float highlighted
New

The paper trail that settles the dispute two years from now

A schedule without an airtight paperwork trail won't survive a dispute. Stale RFIs become delay claims. Missed notice deadlines forfeit your time extensions.

Bearing ties your jobsite documentation directly into your schedule and contract obligations. Defend delay claims, track unconditional lien waivers, and protect your margins without paying for five separate point solutions.

  • RFI log with ball-in-court tracking and overdue response alerts
  • AIA A201 claim-notice clocks — track statutory 21-day deadlines before rights expire
  • Photo-backed punch lists and daily logs tied directly to schedule activities
  • Lien waiver & insurance manager — verify conditional, unconditional, and COI coverage per draw
Project Documentation — Live Status
RFI Log
14 RFIs
2 overdue · 3 pending response
Punch List
38 items
12 open · 26 complete
Drawing Register
Rev C current
47 sheets · 3 for review
Lien Waivers
Pay App #3
5 received · 1 missing
Interactive Schedule Slice

See Real Critical Path Logic in Action

Watch how an MEP rough-in inspection hold instantly consumes float on non-critical work and shifts substantial completion. Real CPM network math on your device.

Project: 2400 Grand Ave Commercial
CSI Code & Activity
Total Float
Project Timeline (Working Days)
Day 1 (Wk 1)Day 6 (Wk 2)Day 11 (Wk 3)Day 16 (Wk 4)Day 21 (Wk 5)Day 25
09-2200Metal Stud Framing
✓ 100% Complete · 5d
0d float
Days 1–55d
26-0000In-Wall MEP Rough-In
CRITICAL
0d float
Days 6–127d
08-1100Door Frames & Backing
FLOAT · 6d float
6d float
Days 8–125d
6d float
09-2900Drywall Hang & Finish
CRITICAL
0d float
Days 13–208d
Substantial Completion: Nov 14 (Day 20)
Bearing CPM Engine: 0ms Recalculation
On Track: Driving Path Clear

All driving activities on schedule. Substantial Completion: Nov 14 (Day 20). 6 days of total float buffer intact on Division 08.

Field Intelligence That Cuts Admin, Not Your Authority

No speculative hallucinations or auto-generated schedules. Bearing applies practical AI where jobsite teams lose the most hours: field documentation.

Walk the Job, Speak the Log

Speak a 30-second memo while walking the deck. Bearing transcribes your voice, categorizes trades, logs headcount, and drafts a complete daily report ready for your one-tap review.

Uncompromising professional standards: AI generates editable drafts, never permanent or unreviewed contract records. You remain the ultimate authority on your project.

Stop paying a penalty for every field seat

Per-seat pricing punishes you for putting software into the hands of foremen and subcontractors.

$712/mo
8 users × $89/user/mo
$199/mo
Bearing Team — 10 seats included

An 8-person commercial project team on an $89/user/month plan costs $712 every month. Bearing Team covers your entire 10-seat office and field roster for $199/mo flat.

Save over $6,100 per year compared to legacy per-seat platforms.

Transparent Pricing & ROI

Consolidate your fragmented software stack. Our price is on this page — see how much you save by switching.

TCO Calculator

5
$200

Includes fragmented tools for scheduling, CRM, and field-photo apps.

Current Annual Cost

$12,000

Bearing Annual Cost

$2,388
Total Annual Savings
$9,612

Predictable Pricing for Growing Commercial GCs

Commercial-grade CPM depth and contract compliance without the enterprise volume tax or six-month onboarding engagements.

Solo

One user, the full platform
$49/mo

Full CPM scheduling and AI co-pilot for a single operator. No compromises.

  • 1 user seat
  • Unlimited Projects
  • AI Co-pilot included: each licensed user adds to one monthly AI limit, shared by your whole team
  • True Offline CPM
  • G702/G703 Pay Apps & Cost Ledger (EAC & Variance)
  • RFI Log, Drawing Register, Submittals & Punch List
  • Subcontractor Directory & COI Tracking, Portfolio Pipeline & Role-based Access
Get Started
MOST POPULAR

Team

Up to 10 users — one flat price
$199/mo

Your office PM, field foremen and subs on one platform. Same full feature set as Solo — no per-seat surprises.

  • Up to 10 user seats
  • Unlimited Projects
  • AI Co-pilot included: each licensed user adds to one monthly AI limit, shared by your whole team
  • True Offline CPM
  • G702/G703 Pay Apps & Cost Ledger (EAC & Variance)
  • RFI Log, Drawing Register, Submittals & Punch List
  • Subcontractor Directory & COI Tracking, Portfolio Pipeline & Role-based Access
Get Started

Enterprise

Unlimited users
$499/mo

Every seat your firm needs, on the same platform as Solo and Team — no feature ever locked behind a higher tier.

  • Unlimited user seats
  • Unlimited Projects
  • AI Co-pilot included: each licensed user adds to one monthly AI limit, shared by your whole team
  • True Offline CPM
  • G702/G703 Pay Apps & Cost Ledger (EAC & Variance)
  • RFI Log, Drawing Register, Submittals & Punch List
  • Subcontractor Directory & COI Tracking, Portfolio Pipeline & Role-based Access
Get Started

Need something bespoke — a custom SLA, or more than one company in a group? Talk to us at [email protected]

How Bearing Stacks Up

Feature / CapabilityBearingProcoreBuildertrend
CPM Scheduling EngineForward/backward pass, total and free float, multiple calendars, data-date progressScheduling included; CPM depth varies by tierCalendar and task scheduling
Billing and float math, verified before every releaseEvery release re-checked against the CPM and AIA billing rules before it shipsNot publishedNot published
Pay Apps From Schedule ProgressAIA G702/G703 with automated carry-forward and field progress reconciliation — no re-keyingInvoicing included; progress entered separatelyInvoicing included; not driven by a CPM engine
Field & Subcontractor SeatsIncluded — 10 seats on Team, unlimited on EnterpriseScoped to your annual construction volumePer-user tiers
Time to First ProjectSame day — no implementation engagementImplementation and onboarding programOnboarding program
Pricing$199/mo flat, published on this pageQuote-based on annual construction volumeQuote-based
Bearing Assistant1